Kubri Engineered Solutions (KES) | DIAMANT Polymer Solutions
Case Study: Ponte 25 de Abril Bearing Replacement

Case Study: Ponte 25 de Abril Bearing Replacement

500 bearings, one of Europe’s major suspension bridges, and a live-traffic structure carrying both road and rail load. MM1018 FL was specified for full-surface contact under continuous cyclic traffic load across a 100-year design life. This case study covers the interface condition, the method used, and the outcome.